The Ceres Project commissioned 23 specialist studies and reports to help inform the development application. These studies have been undertaken by international expert consultants Parsons Brinckerhoff and a variety of specialist sub-consultants on specific aspects of the project including:

  • Scope construction environmental management plan
  • Flora and fauna assessment on Yorke Peninsula
  • Turbine, access track and cable route micro-siting assessment
  • Wind farm noise assessment
  • Cultural heritage survey of the Yorke Peninsula
  • Landscape and visual impact assessment report
  • Electromagnetic interference assessment
  • Shadow flicker assessment
  • Aeronautical impact assessment
  • Traffic and transport assessment
  • Geotechnical desktop study
  • Fire risk assessment
  • Greenhouse gas assessment
  • Surface water assessment
  • Ground water assessment
  • Socio-economic impact assessment
  • Marine habitat mapping survey – sub-sea cable alignment
  • Noise and vibration assessment
  • Coastal process and hydrodynamic assessment
  • Flora and Fauna assessment: St Kilda study area
  • Cultural heritage survey: St Kilda study area
  • Aerial Spraying report
  • Ceres Project open day and fact sheets

These studies assessed the potential impacts associated with the construction and operation of the project and identified a range of mitigation measures to manage identified impacts.

The results of these studies, together with the information gathered from the community and government, were used to design the wind farm and the associated infrastructure.

Download the Development Application Fact Sheet for more information on how the Ceres Project was designed to minimise impacts and to design Australia’s Best Wind Farm.